“We looked at tiles and natural stone but the seamless finish won us over. It genuinely looks like a different house.”

Finish 10 of 10
Most bathroom failures, the damp patches, the mould, the ceiling below, come from inadequate waterproofing rather than the finish on top. We tank the room properly, screed it, and apply the finish ourselves so there is one company and one guarantee.
The finish
Skimping on the membrane under your tiles or microcement always costs more later than doing it properly now.
Waterproofing is the unglamorous part of the job and the one we take most seriously. We prepare the substrate, apply a liquid or sheet tanking membrane with sealed corners and upstands, build the falls in the screed, and only then apply the microcement or resin finish on top. Because we do all three stages, nothing falls between trades and the guarantee covers the whole system.
Read the specification

Where it works

Tanked floor and walls beneath a seamless finish.

Protection for the ceiling below.

Moisture control for lower ground floors.

Waterproof decks and terraces.
Why clients choose it
Prep, tanking, screed and finish, with no gaps between trades.
The places most leaks start, done properly.
Water goes to the drain, not into the corner.
DPM and damp-proofing for slabs and basements.
Microcement, resin or tile on top.
We check the tanking before anything goes over it.
Projects










Specification
Every project is specified to the room. These are the typical figures; your written quote confirms the exact build-up for your space.
| Systems | Liquid tanking membranes, sheet membranes, DPM |
| Areas | Bathrooms, wet rooms, basements, balconies, plant rooms |
| Screed | Falls built in for drainage |
| Finish on top | Microcement, resin or tile |
| Typical install | 1 to 3 days before the finish |
| Guarantee | Covers the complete system |

Questions
Yes, as long as we can inspect the substrate. If it has already been tiled we may need to take that back.
Yes. Many tilers rely on grout to keep water out, which it does not. We tank the room first, then you tile or we apply microcement.
We strip, prepare, membrane and re-finish balconies and terraces, including falls to the outlet.
“We looked at tiles and natural stone but the seamless finish won us over. It genuinely looks like a different house.”
Related finishes

Next step
We come to you, look at the space, talk through the finishes that suit it and give you a fixed written quote within 24 hours. No obligation, no hard sell.
Booking site visits for the next few weeks. Limited installation slots each month.